Shenoy was retained to replace the existing air conditioning system installed during the original building construction for the 1964 Worlds Fair. We provided full MEP design and associated structural work. The scope included installing a new AC system complete with condenser water system, 2 outdoor 75 ton cooling towers, 3 30-ton water cooled air conditioning units, underground condenser water piping, Electrical System with tie‐in to the Fire Alarm System, and incidental Plumbing work including makeup water connection to the cooling tower.