MARCY HOUSES – BOILER UPGRADE
Brooklyn, NY
NYCHA engaged Shenoy for energy-related projects at their various locations throughout New York City. For each of these projects, we prepared engineering specifications, detailed systems design and construction drawings. At Marcy Houses, following inspections, detailed assessments and load calculations, Shenoy prepared preliminary design documents for achieving energy savings, lowering gas consumption and improving system efficiencies. Measures included replacing boilers and burners, removing fuel oil pumps, providing gas and carbon monoxide detectors and replacing existing dated electrical equipment including power, lighting & panel boards.